5L pure water filling machine
  • CGFL 4-4-1 500BPH 5L Water Filling Production Line

    CGFL 4-4-1 500BPH 5L Water Filling Production Line

    Date: 2022/04/15 | Categories: Beverage Filling Machine

    Washing part: bottles are running on the conveyer belt with photo electricity, the bottle cylinder will go out, meanwhile push the bottle into bottle support ring, and bottle neck support catch the bottle neck, than main shaft turned 180degree under gear wheel. Let bottle’s mouth face to land, je...
X

Online Chat

  Email me Mail to us